Friday, January 15, 2010

A BRIDGE TO MORE RIDING


We finally got the bridge sorted across the field drain just in time before the snow melt. The drain is already running high with water and there will be even more over the next few days. The new culvert allows us to ride around the perimeter of the new land and has extended the trackways. When it warms up a little we will put a safety fence on the sides and old railway sleepers on the two sides to stop any potential hoof slip. The plan is to plant hedgerow along the boundary and leave a 3 meter track around the edges for riding. Can't wait until spring.

No comments: